Home ⁄ Новини ⁄ “Ukratominstruments” Corporation has completed preparation for the heating season in Oster

“Ukratominstruments” Corporation has completed preparation for the heating season in Oster

“Ukratominstruments” Corporation has completed the implementation of all the necessary measures for the preparation of the boiler and heating systems of the city of Oster for the heating season 2018 – 2019. As part of the preparatory activities, the following main works were performed:
1) Water-chemical flushing of boilers was carried out
2) Completed Maintenance of the heating main (cleaning of wells, tightening of bolted connections and partial stuffing of stuffing box seals on snaps etc.)
3) Replaced 65 meters of old network pipes
4) Conducted hydraulic testing of the heating main
5) Periodic verification of measuring instruments (pressure gauges, thermometers)

Now before the start of the heating season 2018-2019 gg. all the above mentioned preparatory works have been completed, the boiler and heating systems are ready for operation.

For reference: “Ukratominstruments” Corporation is a participant in the Public Private Partnership (PPP) program with the territorial community of Oster, Chernigiv Region, for the production and supply of thermal energy. Within the framework of the agreement on joint activities, the Corporation fulfilled the re-equipment of the boiler plant by installing boilers for solid fuels and built a new heat pipe line.

Leave a Reply

Your email address will not be published. Required fields are marked *

Show Buttons
Hide Buttons