Reference list
Period of execution | Scope of works |
December 2013 – present time | Implementation of the project “Control center for transportation of Radioactive Materials in Ukraine” |
December 2012 – present time | Supply and installation of a wood incinerator (for SSE «CPORO», ChEZ) |
December 2012 – December 2013 | Mobile premises for installation of MMPC and performing operations on extraction and preparation for transportation of high-level ionizing radiation sources (contract with the French Atomic Energy Commission, the Recipient is SE «UkrSA «Radon») |
August 2012 – December 2012 | Automated system for environmental monitoring of CPEDCC «Gorvodokanal», Dneprodzerzhynsk |
April 2012 – November 2012 | Setting up and commissioning of radiation detection devices in Kirovograd Regional Oncological Center |
April 2012 – June 2012 | Carrying out a range of works on inspection of industrial facilities and mines «Yubileynaya», «Centralnaya», «n.a. Frunze» and «Severnaya» at PJSC «EVRAZ Sukha Balka» for radon and air dust concentration |
December 2011 – April 2013 | Manufacture, supply, installation and commissioning of technical training means for the National Center for maintenance and personnel management training for SE NNEGC «Energoatom» at Zaporozhye NPP (Lot 3). Technical training tool, mock-up “Valves Test Rig Simulator” in the Pipeline Valves Laboratory (contract with the European Commission) |
November 2011 – January 2012 | Carrying out works for the survey of the radiation situation for radon content in the mine «n.a. Ordzhonikidze» at PJSC «CGOK» |
September 2011 – December 2011 | Supply of dosimeters and radiometers for State Environmental Inspectorate of Ukraine |
November 2011 – present time | Implementation of Automated system for ecological monitoring and Automated system for early detection & alert of emergency situations at PJSC «EVRAZ Bagleykoks» |
April 2011 – June 2013 | Development and supply of equipment for monitoring and control system of “Caisson” type Unit for the extraction of solid radioactive waste at Rivne NPP |
December 2010 – December 2013 | Development of design documentation, equipment manufacture and supply, installation and commissioning of integrated control and environmental monitoring system in Dneprodzerzhynsk, personnel training (for Dneprodzerzhynsk City Council) |
May 2010 – June 2013 | Modular mobile protective cell (MMPC) for IRS extraction (development of design documentation, production and certification of MMPC) (contract with the French Atomic Energy Commission, the Recipient is SE «UkrSA «Radon») |
May 2010 – December 2012 | Transport packaging set PKTIB-120N for the storage and transportation of radioactive sources of ionizing radiation (development of design documentation, performing calculations of physical protection and mechanical strength, manufacturing and certification of the batch) (contract with the French Atomic Energy Commission, Recipient – SE «UkrSA «Radon») |
August 2010 – December 2010 | Development of design documentation for Automated system for early detection & alert of emergency situations at PJSC «EVRAZ Bagleykoks», Dneprodzerzhynsk |
June 2010 – 2014 | Development of additional protection level of security alarm system for blocks of ionizing radiation with information output to the central post of PJSC «EVRAZ Sukha Balka». Setup and installation of equipment in the mines «n.a. Frunze» and «Yubileynaya» (for PJSC «EVRAZ Sukha Balka») |
May 2010 – June 2010 | R&D “Detailed documentation for the construction of enterprise on the basis of Novokonstantinovsk uranium ore deposits. Radioecological monitoring system. Development of automated system for air pollution monitoring” (in cooperation with SE “UkrNIPRIpromtehnologii”) |
September 2009 – October 2009 | Design, supply, installation and commissioning of Nuclear Awareness Network at SE “Barrier”, Dneprodzerzhynsk |
April 2009 – June 2009 | Development of scientific technical product “ Development of design documentation for elements of the automated control system of movement and storage of radioactive materials” (in cooperation with the Institute of Environmental Geochemistry of the National Academy of Sciences of Ukraine) |
December 2008 | Modernization of the radiation monitoring system for non-proliferation of radioactive contamination at Yuzhnoukraiska NPP |
2010 – 2012 | Development and implementation of the project “Control center for transportation of Radioactive Materials in Ukraine” (1st stage) |
December 2008 – June 2009 | IAEA order UKR0009-92650N “ Manufacturing and supply of high-grade physical models of the main technological equipment of NPPs for personnel training and service under certificate of work by IAEA” (for Zaporizhzhya NPP) |
November 2008 – June 2011 | TACIS project U4.01/05 “Complex radiation monitoring and early warning system (CRM&EWS) in Chernobyl exclusion zone” |
December 2008 | Development of scientific technical product «Analysis of radioactive materials flow control systems and storehouse facilities» (in cooperation with the Institute of Environmental Geochemistry of the National Academy of Sciences of Ukraine) |
December 2008 – December 2009 | Setting of start-up complex of the 2-nd stage of Automated system of industrial & environmental monitoring of Chepetsky mechanical plant regarding the creation of receiving point on top of the TV tower in Varaskino (Izhevsk, Russia) |
November 2008 | R&D “Development of video surveillance system of fires in the Chernobyl exclusion zone” (for the Ministry of Emergency Situations) |
December 2007 – September 2008 | Creation of scientific and technical product “Design and manufacture of radiation-resistant video equipment for monitoring the spent fuel assembly” (for Chornobyl NPP) |
December 2007 | Supply of equipment for detection of radioactive and nuclear materials at the checkpoints in Chernobyl Exclusion Zone (for SSRPE “Ecocentre”) |
December 2007 – December 2008 | Design, supply, installation and commissioning of the radiation monitoring system of the 1st stage of production complex “Vector” (radiation monitoring and environmental monitoring) |
December 2007 – March 2008 | Design, supply, installation and commissioning of Integrated system for radiation monitoring of the personnel contamination at the exit to the «Semikhody» railway platform (for Chornobyl NPP) |
October 2007 – November 2007 | Supply of equipment for detection of radioactive and nuclear materials at the checkpoints in Chernobyl Exclusion Zone (for SSRPE “Ecocentre”) |
September 2007 – November 2007 | Automated measuring system for industrial & environmental monitoring (“Chepetsky mechanical plant” LLC; Glazov city, Udmurtia republic, Russia) |
March 2007 – February 2008 | EC project SIP05-3-001-15: “Development of design documentation. Supply, installation and commissioning of teledosimetric monitoring system at Chornobyl NPP |
December 2006 – June 2007 | IAEA order UKR9022-93401S: “Supply, installation and commissioning of data integration system for automated radiation monitoring” (for SSRPE “Ecocentre”) |
December 2006 | Supply of radiation monitoring equipment (for Chornobyl NPP) |
November 2006 – December 2006 | Instrumentation of State Environmental Inspectorate of Ukraine with radiation monitoring equipment |
August 2006 –November 2006 | Supply of radiation monitoring equipment in the framework of the EC contract SIP05-3-001-14 – “Removing the berm pioneer wall of “Shelter” object at ChNPP” |
May 2006 – August 2006 | IAEA order UKR9022-87095S: «Supply, installation and commissioning of the radiation portal monitor with video surveillance system at «Dityatki» checkpoint and providing training of SSRPE «Ecocentre» personnel |
March 2006 – June 2006 | Supply of means of individual dosimetry for inspectors of State Nuclear Regulatory Committee (SNRC of Ukraine) |
December 2005 – 2007 | TACIS project: “Modernization of Automated Radiation Monitoring System (ARMS) in Chernobyl exclusion zone” (for SSRPE “Ecocentre”) |
December 2005 – 2006 | Supply of gamma radiation detection units according to the implementation plan at the “Shelter” object under contract SIP05-3-008-01 (for Chornobyl NPP) |
November 2005 – November 2006 | R&D «Modification of detection units, development of software and special measurement technique for dosimeter-radiometer to measure the dose of gamma and beta radiation and radon concentration» (for SSRPE “Ecocentre”) |
November 2005 – December 2005 | Supply of radiation monitoring equipment (for SSRPE “Ecocentre”) |
November 2005 – November 2006 | R&D “Analytical processing of data on amounts of RW accumulated at SSE “Chornobyl NPP” (for SSRPE “Ecocentre”) |
November 2005 – March 2006 | Supply, installation and commissioning of radiation monitoring equipment in the building of repository for liquid and solid radioactive waste (RLSW) (for Chornobyl NPP) |
July 2005 – October 2005 | Supply, installation and commissioning of radiation equipment for 1430 seats (for sanitary inspection at Chornobyl NPP) |
February 2005 – April 2005 | Supply of equipment for monitoring non-proliferation of radioactive and nuclear materials (for Border Service of Ukraine) |
November 2004 – 2006 | Supply and installation of isotopic hydro- and densitometers (for JSC “Azovstal”) |
October 2004 – December 2004 | Contract SIP 05-3-003-2. Laboratory equipment. Radiation Protection. Lot 2: “Equipment for monitoring and evaluation of environmental parameters”; Lot 4: “Refrigerators” (for Chornobyl NPP) |
December 2004 – 2005 | Design, manufacture and testing of ladle dosimeter DK-01, personnel training (for SSE “Chornobyl NPP”) |
November 2004 – April 2005 | Supply and installation of radiation monitoring equipment |
September 2004 – April 2005 | Supply and installation of radiation monitoring equipment |
December 2003 – December 2004 | Supply of radiation monitoring equipment (for Security Service of Ukraine) |
July 2004 – August 2004 | Supply of equipment for JSC “Ukrtransnafta” |
July 2004 – September 2004 | Supply of radiation monitoring equipment (for Khmelnitsky NPP) |
July 2004 – September 2004 | Supply of electrical equipment (for SE “East GOK”) |
June 2003 – 2006 | Supply, installation and commissioning of equipment for radiation monitoring in CEZ |
November 2003 – December 2003 | Supply and installation of radiation portal monitors |